9 km of pipeline of which 6.3 km of water will be transported by gravity from the reservoir to the DWTP of the Consorcio del Huesna. The embankments, as well as the conditioning of the communication roads, the service road and the installation of the pipeline in a trench involved the execution of cuttings and embankments, in accordance with the topography of the land. The excavation of the tunnel required the application of mining methods and the use of explosives.
template.leer-masMinesur will execute 12,000 predilling drillings of 127 mm diameter to drive the structures that will support the solar panels.
template.leer-masDuration of the work 5 months, the pre-drilling works for driving the structure were completed satisfactorily for CRC Obras y Servicios S.L.