Drilling works on the Cáceres South-East Ring Road

A key project to strengthen the area’s infrastructure and improve transport links. Over the summer months, our teams carried out the technical drilling work for the Cáceres South-East Ring Road (bypass) project.

✅ Technical expertise: Self-propelled tracked drilling rigs for site preparation.

✅ Rigour and safety: Vibration control and safety measures in a sensitive environment due to the proximity of urban housing.

✅ Commitment to the environment: Adherence to deadlines and environmental protection.

Thank you to the entire technical team for ensuring excellence and safety at every stage!

template.delegacion_sur

template.oficina_central

Valverde del Camino (Huelva)
Localización
Parque Industrial y Tecnológico, Nave E08, 21600 Valverde del Camino (Huelva)
Telefono
959 14 34 86
Email
administracion@minesur.es
template.delegacion_norte

template.delegacion_norte

Oviedo (Asturias)
Localización
Plaza Longoria Carbajal, nº 3 1º oficina 3, 33002 Oviedo
Telefono
959 14 34 86
Email
administracion@perforacionesnoroeste.es
template.delegacion_galicia

template.delegacion_galicia

A Coruña (Galicia)
Localización
C/Obradoiro, nº44
15190 A Coruña
Telefono
959 14 34 86
Email
administracion@minesur.es
Proyecto financiado por el KIT DIGITAL