New PSF renewable energy project in Pujalt (Barcelona) for Savilcon Energía. Solar energy.

Minesur will execute 12,000 predilling drillings of 127 mm diameter to drive the structures that will support the solar panels.

Solar photovoltaic plants are positioned as fundamental pillars of the energy transition.It is vital to use clean technologies that reduce our carbon footprint and promote a greener future.

template.delegacion_sur

template.oficina_central

Valverde del Camino (Huelva)
Localización
Parque Industrial y Tecnológico, Nave E08, 21600 Valverde del Camino (Huelva)
Telefono
959 14 34 86
Email
administracion@minesur.es
template.delegacion_norte

template.delegacion_norte

Oviedo (Asturias)
Localización
Plaza Longoria Carbajal, nº 3 1º oficina 3, 33002 Oviedo
Telefono
959 14 34 86
Email
administracion@perforacionesnoroeste.es
template.delegacion_galicia

template.delegacion_galicia

A Coruña (Galicia)
Localización
C/Obradoiro, nº44
15190 A Coruña
Telefono
959 14 34 86
Email
administracion@minesur.es
Proyecto financiado por el KIT DIGITAL