Two leaders in underground mining join forces to launch the Santa Barbara project: ‘La Mina en Vivo’ (The Mine Live). Minesur and Contratistas Mineros begin work on the entrance to the tunnel of the Fundación Santa Barbara mine located in Caboalles de Arriba (León).
Project: Adaptation of the Laciana Vocational School for tourist use. Duration: 12 months